Cost of Vacancy Calculator
See what an open Lean, CI or operations role is costing you per day, per week and in total, using your own numbers.
- An open role costs you the work that isn’t getting done, plus whatever you pay to cover it and to recruit.
- Enter your own numbers below to see the cost per day, per week and in total.
- Nothing is saved or sent anywhere. The math runs in your browser.
When a Continuous Improvement Manager, Black Belt or plant leader seat sits empty, the cost rarely shows up on one line of a report. Projects stall, overtime creeps up, and managers spend hours screening resumes instead of running the operation. This free cost of vacancy calculator puts a number on it, using only the figures you enter.
Cost of vacancy calculator
Enter your numbers above to see the cost.
How the cost of vacancy is calculated
The calculator adds up three things, all from your inputs:
- Lost value. The yearly value the role should deliver, divided by 52, times the weeks open, times the share of the work that isn’t getting done. If you leave the value blank, the salary is used. That is a floor: companies hire a role because it is worth more than it costs.
- Cover costs. Your weekly overtime, temp or contractor spend, times the weeks open.
- Hiring costs. What you have already spent to recruit.
The “net of salary not paid” figure subtracts the salary you saved while the seat was empty, so you can see the true gap. If that number is near zero, try entering the role’s real value (for example the savings target on a CI program). That is usually where the cost hides.
Example: A plant budgets $110,000 for a Continuous Improvement Manager whose program targets $400,000 a year in savings. The role is open 12 weeks, 75% of the work isn’t getting done, overtime coverage runs $600 a week and $3,000 has gone to job ads. Lost value is about $69,200, cover costs $7,200 and hiring $3,000: roughly $79,400 in total, and about $6,400 in lost value and cover for every week the seat stays empty.
How to lower the cost of an open role
- Write a sharp job description. Name the projects, the belt level and the results you expect. Our Lean Six Sigma job description template helps.
- Hire for the right belt. A Black Belt search for a Green Belt job stalls the process. See Green Belt vs Black Belt vs Master Black Belt.
- Interview for finished projects. Use the 12 interview questions that work to separate real results from certificates.
- Know your benchmarks. Compare your weeks open with published figures in cost per hire and time to fill benchmarks.
If the seat has been open too long, talk with Ann about the search. JIT Recruiting has placed Lean and Six Sigma talent for more than 20 years.
Frequently asked questions
What is the cost of vacancy?
It is the money a business loses while a position is unfilled: the work and results that don’t happen, plus the extra spend on overtime, temps and recruiting. It is different from cost per hire, which only counts what you spend to fill the job.
Why not just use the salary?
Salary is what the role costs, not what it is worth. A Continuous Improvement or Lean leader is usually hired to deliver savings or output well above their pay, so using only the salary understates the cost. Use the salary as a floor if you don’t know the value.
Does this calculator store my numbers?
No. Everything runs in your browser. Nothing is saved, sent or tracked, and the numbers disappear when you leave the page.
How can I shorten time to fill for a Lean Six Sigma role?
Be specific about the belt level and projects, move qualified candidates through interviews within days, and reach people who aren’t actively job hunting. A specialist recruiter can do the last part faster than job boards.
How it works: all figures come from your inputs. Related guide: Cost per Hire and Time to Fill: 2026 Benchmarks for Employers (SHRM and BLS sources).

